Universal grinder use, maintenance and repair knowledge
 ¡¡¡¡Universal shredder details:
¡¡¡¡A universal grinder to use
¡¡¡¡Universal grinder, turn off the power switch.
¡¡¡¡1, open the cover (clockwise off counter-clockwise to open).
¡¡¡¡2, dry drugs into crushed box.
¡¡¡¡3, the cover closed.
¡¡¡¡4, plug in the universal grinder power, turn the timer switch.
¡¡¡¡5, when the sound of rolling uniform, indicating that the drug has been crushed into a powder, to close the universal grinder.
¡¡¡¡6, open the cover and pour the powder.
¡¡¡¡Universal grinder Cautions
¡¡¡¡1, to the personal safety of users of universal grinder, power must be grounded cord.
¡¡¡¡2, grinding material must be dry, wet and grease should not be processed traditional Chinese medicine.
¡¡¡¡Crushed drugs do not exceed the half the crushed slot capacity.
¡¡¡¡4, general medicine crushed Just half a minute, crushing of hard drugs in the minutes.
¡¡¡¡5, universal grinder can not be continuously used for a long time of not more than five minutes each boot time. If the processing of a large number of interval use to prevent bearing overheating and damage the motor.
¡¡¡¡6, when the cover is opened, do not start switch.
¡¡¡¡7, after long-term use, the carbon brush and blade as badly worn and needs to be replaced.
¡¡¡¡8, regular checks the universal grinder blade screws must be tightened.
¡¡¡¡Daily work is completed, the universal grinder idling 2min, to suction clean more than expected. After the shutdown, open the cover to check parts for damage, clear more than expected and close the lid.
¡¡¡¡Gao, the rotational speed of the stirring blades of the grinder, the work load is not, therefore, generally in the normal working is rarely failure.
¡¡¡¡Usually work maintenance should pay attention to the following matters:
¡¡¡¡(1) Be sure to press universal the grinder operating procedures performed best universal grinder maintenance.
¡¡¡¡¢Ú note the universal grinder start normal after feeding mixed feeding should be slowly added in the order.
¡¡¡¡¢Û to get ready seals, coupling with a rubber band, V belts and rolling bearings, these pieces work parts prone to failure, if necessary, should be promptly replaced.
¡¡¡¡¢Ü regular <general in the first quarter) check each fastener loosening; Check the tightness of V-belts installed; the universal grinder ministries to cleaning decontamination, dust.
¡¡¡¡The universal grinder maintenance generally once a year. Note the following:
¡¡¡¡¢Ù Checking trimmed stirring paddle, the scrapers with mixed indoor wall clearance should meet the following requirements.
¡¡¡¡¢Ú Remove the Rolling cleaning check; serious wear parts replacement. Replace the grease and seals.
¡¡¡¡(3) Check the main drive shaft bending or wear.
¡¡¡¡¢Ü Check cleaning cylinder, replace the seals and wearing parts guide sleeve, check the piston rod bending deformation and wear phenomena.
¡¡¡¡¢Ý main parts check good records necessary tests, parts accessories, proposed the next repair and replacement.
Related News:
¡¤ Innovation, energy saving, environmental protectio  
¡¤ Vacuum dryer product performance characteristics a  
¡¤ Vacuum dryer used for inspection and debugging wor  
¡¤ Difficulties and reasons cannot start mixing machi  
¡¤ The correct operation method using vacuum dryer  
¡¤ Development advantages and characteristics of dome  
¡¤ The difference between the special vacuum dryer an  
¡¤ Detailed description of each component characteris  
¡¤ The dominant position in the whole vacuum dryer dr  
¡¤ Trough type mixer sometimes appear large area leak  
Related Products:
¡¤ PGL Spray Drying Granulator
¡¤ High speed mixer
¡¤ SET series double screw extrusion pelletizer
¡¤ VI forced mixer
¡¤ Mixing machine W series
¡¤ Powder machine ZSJ series vibrating screen
¡¤ FZ series of crushing granulator
¡¤ Chinese medicine grinder
¡¤ DWT series of drier for dehydrated vegetables
¡¤ Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519£­88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

ºìÇÅÇø| ÁÉÑôÊÐ| μÄÏÊÐ| ÓñÁÖÊÐ| ÁÉÑôÏØ| ÄÏͶÊÐ| ÍòÔØÏØ| Ñô¹ÈÏØ| ÑôÎ÷ÏØ| èµÉ½ÏØ|